Large tent building tutorial

(Summary description)

  • Categories:Event tent
  • Author:
  • Origin:
  • Time of issue:2020-05-28 11:41
  • Views:
Information

Today, more and more tents are used in corporate activities. Many companies will choose to purchase and rent tents for temporary use, but the construction of large tents has stumped many companies. Today I will share the tents for everyone Tutorials and notes!

The first step: setting up on-site lofting and fixed base

According to the specifications and size of the tent used, the overall tent construction is laid out. First set out at the construction site, all the base chassis must be on a horizontal line. Determine the position of all the bases, and then fix the bases after confirmation!

Step 2: Place the materials

With reference to the installation instructions, the materials of each component will be placed at the joint of the corresponding assembly according to the connection relationship and construction position of each component.

Step 3: Combine the framework

1. Installation of ridge connection angle and inclined beam: insert the ridge connection angle into the left and right inclined beams, and then fasten with bolts

2. Installation of load-bearing columns and inclined beams: After assembling the load-bearing columns and inclined beams to the holes, fasten with bolt

3. Installation of the load-bearing column and the base: align the pin holes of the load-bearing column built-in parts and insert the cylindrical pin, and then lock with the opening lock, and so on, all the connection and installation are completed on both sides

Step 4: Erect the frame

Install the two lifting belts on the inclined beam separately, and use the traction equipment (such as a crane) to rectify the first group of frames through the correct and safe link of the traction contraction and the inclined beam. The other side must have a reverse pull rope. Prevent excessive traction and anti-dumping.

Step 5: Install eaves and roof square pipes

Hang the end of the eaves square tube with the hook first into the U-shaped buckle of the erected frame, and then lift the other end with a fork rod to hang into the corresponding U-shaped buckle (note: the left and right sides need to be correspondingly), and then use the same The method of hanging all the eaves and roof square pipes.

Step 6: Install the center column and side column of the gable

Align the inner corner of the gable with a right angle upward and the cylindrical hole on the connection angle of the roof ridge, and link it with bolts. The bottom end should be connected to the base, locked with a cylindrical pin, and then install the weight column in the same way (note: the base should not be fixed first). After installation, adjust the center and side columns according to the flatness of the construction site. When the parallel and stable state is maintained, the base is fixed!

Finally, as long as the tarpaulin is installed, the tension rod is inserted into the side groove under the side wall or gable tarpaulin, the two sides are fixed on the base, and a comprehensive inspection is completed to complete the tent construction!

After reading the tutorial, do you think that tent construction is not a simple matter, but professional things should be left to professional people to do, choose Suzhou WT tent, we can provide you with professional tent construction services!
Contact: Tel: 400-800-9772 (8: 00-17: 00)

               Mobile: 18012715925 18962610588

Keyword:

Scan the QR code to read on your phone

Related Products

There is currently no content to display
Please add data record on website background.
Username used for comment:
Customer message
Description:
chuanshiji
WT HOLDINGS GROUP Co.,Ltd.

Solution               Products               About               Blog               Contact

这是描述信息
这是描述信息

ADDRESS:

No.389,Zhenghe east Road,Ludu Town,Taicang City,JiangSu Province,P.R China.

这是描述信息

TEL:

24H Hotline:+(86)0512-53718998
Mobile:+ ( 86 ) 13812929818