BLOG

>
>
Company news
BLOG
Fighting against the epidemic, the charge is ahead - Suzhou Wt Tent Co., Ltd. is in action

Fighting against the epidemic, the charge is ahead - Suzhou Wt Tent Co., Ltd. is in action

Win the battle against the epidemic The epidemic is rebounding hearts will not disperse Unity Fight against the epidemic The pneumonia epidemic caused by the new coronavirus broke out again in early 2022, and a tough epidemic prevention battle was launched across the country. Under the leadership of government organizations at all levels, public security, traffic police, health and quarantine and other departments quickly set up temporary quarantine points at various expressway intersections, important transportation hubs, urban communities and other places to conduct 24-hour quarantine inspections on passing vehicles and pedestrians, and do their best Control the spread of the epidemic.      The epidemic is an order, and prevention and control is a responsibility. In the early days of the outbreak, Suzhou Wisbert (Assembled Building) Tent Manufacturing Co., Ltd. received the task request from the relevant government departments for the construction of tent facilities at the epidemic prevention checkpoint site. In the case of tight time and heavy tasks, Actively integrate multiple resources to fully support security work Suzhou Wisbert (Assembled Building) Tent Manufacturing Co., Ltd. quickly mobilized a large number of construction personnel, went straight to the site after the community temperature measurement and registration, immediately started to check the construction list, delivered goods and loaded vehicles overnight, and contacted multiple parties to schedule personnel engineering. car, into the fight.Wisbert has continuously dispatched construction personnel outside the country. He has just finished the isolation of the personnel on duty at the Beijing Winter Olympics. After the 14-day isolation period, he also quickly joined the construction and maintenance of the epidemic prevention tent. Braving the cold winter rain, the workers fought on the construction site in soaked clothes and shoes, rushing for time and progress without delaying the construction period at all.In this special period, there are certain difficulties in personnel arrangement and material procurement and allocation, and this task has many sites and long distances, ranging from a few kilometers to hundreds of kilometers, which adds a lot of difficulty to material scheduling and personnel cooperation. Regardless of cost or remuneration, Westbert has done a good job of logistical support for epidemic prevention work as a criterion. After several days of hard work, he has completed the current task with quality and quantity.Up to now, hundreds of large cranes, large and small trucks, and other vehicles have been used, and hundreds of kilometers round trip every day. Only in the large city of Suzhou (5 counties and 7 districts), tents for nearly 100 temporary epidemic prevention and control sites in various cities and counties have been completed free of charge, and more than ten sites are under intense construction. The total construction area of this task is nearly 10,000 square meters, including iron horses, lighting and other temporary construction facilities.Wisbert is willing to work with all the medical staff and health and quarantine institutions who are on the front line in times of crisis, to accompany the "epidemic" road and overcome the difficulties together! Do your best to fight against the epidemic!   Westbert      All products of Suzhou Wisbert Tent Manufacturing Co., Ltd. are made in Germany, and the main structure is made of high-strength aluminum alloy. The tarpaulin is based on polyfilament long resin, and the surface is attached with PVC film. The tarpaulin is mainly white, and other colors can be customized. The Wisbert smart tent has the following characteristics: weatherproof, anti-ultraviolet, B1-level fireproof, cold-resistant, anti-wrinkle top cloth, opaque, weight 850g/m2, fire-retardant, in line with German DIN 4102 B1, M2 standards Wind load capacity 80-100Km/h.        Company inventory tent: span (width) from 3m-70m, the length can be increased infinitely according to 3m/group or 5m/group. The side height ranges from 2.6m to 12.5m. It has the properties of fireproof, windproof, firm and reliable.        The main products are: spire, herringbone, spherical, curved, arched, peach-shaped and various special-shaped tents. Our event tents, storage tents, wedding tents, and exhibition tents are widely used in family gatherings, business meetings, exhibitions, large-scale celebrations, warehousing logistics, disaster relief inspections and other scenarios. There are no pillars in the middle of the tent, and the venue is 100% used.        Tent interior supporting: floor, platform, carpet, cloth curtain, lamps, air conditioner, stage, audio, table, chair, and other equipment. One-stop all-round service to fully meet customer needs. Fixing method: free method 1: steel brazing (soil ground is suitable for steel brazing);                 Free way 2: Expansion screws (if the ground is cement
Groundbreaking ceremony tent supplied by WT

Groundbreaking ceremony tent supplied by WT

Translucent and Transparent dome tent

Translucent and Transparent dome tent

How to choose the right tent?

How to choose the right tent?

WT Tent's core competitive advantage

WT Tent's core competitive advantage

The best international tennis match viewing experience is in the WT Tent

The best international tennis match viewing experience is in the WT Tent

Last page
1
2
3

Blog Categories

分类出来

Recent Posts

Break through the haze of the epidemic and welcome the economic recovery; Many celebration activities around social and economic recovery were held one by one

Break through the haze of the epidemic and welcome the economic recovery; Many celebration activities around social and economic recovery were held one by one

Welcome the economic recovery-WT tent WT Tent: Be a good salute for the social and economic recovery. In December 2022, under the heroic decisions of governments at all levels, all parts of the country began to open control measures against the COVID-19 epidemic. For economic development, governments at all levels are the leaders and pioneers. In order to actively promote social and economic recovery from the COVID-19 epidemic, governments at all levels organized activities to promote economic development this month, such as project commencement, consumption festival, foundation ceremony, completion ceremony, etc. WT Tent is determined to become a salute to the socio-economic recovery. Up to now, our company has undertaken more than 12 government projects at all levels. This issue introduces four classic project cases. News Project completion Gather in the United States and create the future together. On December 15, the opening ceremony of the Sino-South Korea Biomedical Biotechnology (XX) Industrial Park and the opening ceremony of XXX China Headquarters was held in XX City, Jiangsu Province. This event is a key step for XX City to build the best carrier of the international medical biotechnology industry in the Yangtze River Delta. The medical biotechnology industry will also become a "new business card" of the "beauty" economy of XX City, where a ten-billion-level industrial cluster will be born. News Double 12th Consumption Festival On December 10, the "Laughing XX · Tesco XX" Rotenberg Market Double 12 Shopping Festival was launched. The wonderful programs, all kinds of tempting food, and a wide range of commodities make the citizens gather in the wave of carnival shopping and linger. News Project foundation In 2022, the key projects in XX Town will be launched and opened together with the development conference of "ten years to start again" of the biological medicine industrial park in XX City. The groundbreaking ceremony of the commercial complex project in the southern new town of XX was held at the same time. The project is located in the south of the administrative center of the new town in the southern part of XX town, with a total investment of about 1.2 billion yuan, an area of about 40 mu, and a total construction area of about 90000 square meters, of which 24000 square meters are planned to be built into a five-star high-end hotel integrating the assembly hall, banquet hall, Chinese and Western restaurants, swimming pool, and gym, and 66000 square meters are planned to be built into a benchmark young fashion family on the same day, The high-quality economic development achievements of XX Town in 2022 and the key projects of commencement and opening will be intensively displayed. News The project started XX City has deeply implemented the cooperation agreement of "Sports Alliance around XX Lake" to promote the high-quality development of sports. The area of sports facilities in the city has reached 1.77 million square meters. In order to meet the needs of people's sports life, the XX Lake National Fitness Center was officially opened on the 15th. XX Lake National Fitness Center has a total land area of 15423.12 square meters and a total investment of about 410 million yuan. It will take advantage of the landscape of Nanyuan Lake to build a natural ecological community central park. The center has a basketball hall, a swimming pool, a badminton hall, a library, supporting businesses, and a boutique supermarket, which integrates sports and commercial space. It is expected to be completed by the end of 2024, and will provide residents with a green harbor for sports and relaxation.   WT Tent        All products of Suzhou Wt Tent Co., Ltd. are made in Germany, and the main structure is made of high-strength aluminum alloy. The tarpaulin is based on polyfilament long resin, and the surface is attached with PV film. The tarpaulin is mainly white, and other colors can be customized. The Wisbert smart tent has the following characteristics: weatherproof, anti-ultraviolet, B1-level fireproof, cold-resistant, anti-wrinkle top cloth, opaque, weight 850g/m2, fire-retardant, in line with German DIN 4102 B1, M2 standards Wind load capacity 80-100Km/h.        Company inventory tent: span (width) from 3m-70m, the length can be increased infinitely according to 3m/group or 5m/group. The side height ranges from 2.6m to 12.5m. It has the properties of fireproof, windproof, firm and reliable.        The main products are: spire, herringbone, spherical, curved, arched, peach-shaped and various special-shaped tents. Our event tents, storage tents, wedding tents, and exhibition tents are widely used in family gatherings, business meetings, exhibitions, large-scale celebrations, warehousing logistics, disaster relief inspections and other scenarios. There are no pillars in the middle of the tent, and the venue is 100% used.        Tent interior supporting: floor, platform, carpet
2023-01-11
[Popularization] From field survey to the completion of the project, WT Tent takes you to understand the entire process of project progress.

[Popularization] From field survey to the completion of the project, WT Tent takes you to understand the entire process of project progress.

Dedication Ceremony   Project instruction On November 28, the first phase of the project in the first phase of the Science Park and the future development plan release ceremony was grandly held. ** Kunshan Science Park focuses on creating the "Yangtze River Delta Precision Intelligent Manufacturing Science Park", closely linked to the main lines of "high -quality development" and "gathering new kinetic energy", and systematically builds the "R & D, production, intellectual manufacturing, and expansion" industry chain. Innovate the intelligent platform to accelerate. The main leaders of the Municipal Party Committee attended the completion ceremony. After receiving the project task, Westbert surveyed the project to complete from the venue, and experienced the full 72 hours that were intensive but in an orderly manner. The following editors will take you through the entire process of the project progress of the grand project of the grand project. Project exploration Before building prefabricated tent buildings, project survey is an important first step. Westbert treats each project to build tasks seriously. The company requires that the salesperson must lead at least one project engineer to investigate the project to build the site. Main understanding: 1. Construction venue type to determine the use of reliable fixed methods; 2. Conditions for construction venues to determine whether there are obstacles, whether there is a power supply at the scene; 3. Whether construction machinery allows large machinery operations; 4. Maximum traffic restrictions, determine how long transportation vehicles are used; 5. High on -site, whether it affects the construction of the tent; 6. Entry conditions: Do you need to admit permit or epidemic prevention related information. There were 60cm venue gaps at this project, which caused certain difficulty to the construction of facilities such as prefabricated tent buildings.   Project meeting In order to solve the problem of venue differences, at the daily project communication conference of Westbert, engineering and technical personnel have formulated a corresponding feasibility plan after risk assessment, and quickly passed it to the Ministry of Security of the Engineering Center. Other relevant departments quickly deploy Related plan.   Material emitting Time is tight and heavy, the Westbert Warehousing Department quickly prepares for delivery. Within 2 hours, the relevant items are installed on the transport vehicle.   Site construction The Ministry of Engineering mobilizes two construction teams and separates. Within 36 hours, the construction of prefabricated tent buildings is completed on time in accordance with the construction progress plan. Starting frame ↑ Hanging ↑ ↑ Hanging enclosure ↑ ↑ Hanging decorative curtain ↑ Stage entry ↑ Solution In response to the problem of 60cm gap at the construction site, Westbert used the method of leaning stone to find a flattened stone to make all the soles of the prefabricated tent building at the same level. The professional technicians of the Safety Department of Westbert Engineering Center repeatedly tested on the spot to verify and ensure the absolute safety of on -site tents. Due to the gap at the scene, in order to deal with the rainfall on the day of the event, the Westbert Engineering Department built a waterproof hurdle around the prefabricated tent building to prevent rainwater from gathering and pouring into the venue.   Project presentation After 72 hours of hard work, under the cooperation of many departments of Westbert, a theme is clear, the atmosphere, and the safe and reliable settlement ceremony of the temporary building will be completed. KT board ↑ Temporary toilet ↑ Said ↑ ↑ Fire equipment ↑ Add Velvet carpet ↑ Green plant decoration ↑ VIP sofa ↑ Decorative Mantle ↑ Light ↑ Theme table and chair ↑   WT Tent        All products of Suzhou Wt Tent Co., Ltd. are made in Germany, and the main structure is made of high-strength aluminum alloy. The tarpaulin is based on polyfilament long resin, and the surface is attached with PV film. The tarpaulin is mainly white, and other colors can be customized. The Wisbert smart tent has the following characteristics: weatherproof, anti-ultraviolet, B1-level fireproof, cold-resistant, anti-wrinkle top cloth, opaque, weight 850g/m2, fire-retardant, in line with German DIN 4102 B1, M2 standards Wind load capacity 80-100Km/h.        Company inventory tent: span (width) from 3m-70m, the length can be increased infinitely according to 3m/group or 5m/group. The side height ranges from 2.6m to 12.5m. It has the properties of fireproof, windproof, firm and reliable.        The main products are: spire, herringbone, spherical, curved, arched, peach-shaped and various special-shaped tents. Our event tents, storage tents, wedding tents, and exhibition tents are widely used in family gatherings, business meetings,
2022-12-19
The economic recovery is inseparable from the investment promotion ceremony, the investment promotion ceremony is indispensable

The economic recovery is inseparable from the investment promotion ceremony, the investment promotion ceremony is indispensable

Prefabricated Tort Buildings     Actively respond to optimizing the "twenty measures" of the epidemic prevention and control to ensure the stable operation of the national economy. Governments at all levels actively act to increase government investment promotion activities. The Westbert's prefabricated tent adds different colors to government investment activities at all levels.     For two consecutive working days, Westbert completed three consecutive governments at all levels of government investment promotion series. Facing the unique needs of different customers, Westbert actively innovated and courageous. Protect the smooth protection of each government activity,   Golden Autumn Economic and Trade Investment Campaign     Take the wind by eight sides. On the morning of November 18th, the opening ceremony of the Golden Autumn Economic and Trade Investment Promotion of 2022 and the opening ceremony of the Park Acceleration District was held. 10 European and American projects and 10 talents science and technology innovation projects at the scene signed a contract, 8 new projects settled in the accelerated zone project were awarded the key to entering the park, and 10 opened projects were issued business licenses. On the tenth anniversary of the pilot system reform, a number of private, Taiwan -funded, and European and American contributing companies were commended.   The launching ceremony of major projects     On November 18th, a city's comprehensive bonded zone took the lead in launching the "one area of ​​multiple films and direct access" logistics circulation models nationwide, opened up the "microcirculation" of foreign trade logistics, and ran out of the "acceleration" of customs clearance. Quality development adds strong momentum. Leaders at all levels of provinces and municipalities participate in the launching ceremony of the project.   Modern factory building ceremony     The semiconductor industry in the high -tech zone of our city has completed the investment quota of 1 billion in the first phase of the first phase in 2022. On November 21, 2022, the first modern plant was put into use. In the factory area, the Westbert's tent building is used to set up a 5M -high factory building to complete the ceremony hall.   WT Tent        All products of Suzhou Wt Tent Co., Ltd. are made in Germany, and the main structure is made of high-strength aluminum alloy. The tarpaulin is based on polyfilament long resin, and the surface is attached with PV film. The tarpaulin is mainly white, and other colors can be customized. The Wisbert smart tent has the following characteristics: weatherproof, anti-ultraviolet, B1-level fireproof, cold-resistant, anti-wrinkle top cloth, opaque, weight 850g/m2, fire-retardant, in line with German DIN 4102 B1, M2 standards Wind load capacity 80-100Km/h.        Company inventory tent: span (width) from 3m-70m, the length can be increased infinitely according to 3m/group or 5m/group. The side height ranges from 2.6m to 12.5m. It has the properties of fireproof, windproof, firm and reliable.        The main products are: spire, herringbone, spherical, curved, arched, peach-shaped and various special-shaped tents. Our event tents, storage tents, wedding tents, and exhibition tents are widely used in family gatherings, business meetings, exhibitions, large-scale celebrations, warehousing logistics, disaster relief inspections and other scenarios. There are no pillars in the middle of the tent, and the venue is 100% used.        Tent interior supporting: floor, platform, carpet, cloth curtain, lamps, air conditioner, stage, audio, table, chair, and other equipment. One-stop all-round service to fully meet customer needs. Fixing method: free method 1: steel brazing (soil ground is suitable for steel brazing);                  Free way 2: Expansion screws (if the ground is cement and can be destructively constructed, it is suitable for expansion screws, which can reduce the cost);                 Charge method 3: cement block, yellow sand, water tank weight (no destructive construction on the ground);     Tent products can be widely used in the exhibition industry: outdoor temporary exhibition halls, indoor/outdoor special sales booths, temporary exhibition halls, VIP lounges, reception centers, news centers, speech venues, conference rooms, product tour exhibitions, new product releases, publicity displays, etc. .     The tent products are made of aluminum alloy structure, which can be freely spliced ​​according to the size of your venue. Holding exhibitions in the exquisite tent can extend your creative space infinitely. END WT Tent looks forward to working with you Suzhou Wt Tent Co., Ltd. www.chinapartytent.com Domestic branches: Shanghai, Xinjiang, Zhengzhou                      Beijing Hangzhou Guangzhou Foreign branches: Italy, France National free consultation hotline: 400-800-9772 86-138-1292-9818 WT Tent thanks for your attention
2022-11-29
WT Tent warmly welcomed the leaders of the Hangzhou Asian Organizing Committee and his party visited our company to visit and guide the work

WT Tent warmly welcomed the leaders of the Hangzhou Asian Organizing Committee and his party visited our company to visit and guide the work

The Asian Organizing Committee came to guide the work WT Tent-Large Link Construction Program Service Provider The Asian Organizing Committee came to guide the work On October 28, 2022, the relevant leaders of the 19th Hangzhou Asian Games Organizing Committee visited the WT Tent Industrial Park to visit and inspect. And conduct detailed guidance of our work on the tasks of the Asian Games related venues. WT Tent actively does a good job of reception, carefully study the work guidance of the Asian Organizing Committee leadership, and promises to the leaders of the Asian Organizing Committee. The construction of the Asian Games on each Asian Games was successfully completed. Figure 1: WT Tent successfully completed the Chun'an Division Asian Games Test Tournament Mission Figure 2: WT Tent successfully completed the Chun'an Division Asian Games Test Tournament Lingjian Mission   Work guidance Guide the Asian Organization Officials and WT Tent's Business Team to hold a working conference After the relevant leaders of the Asian Organizing Committee visited the WT Tent Factory, the leadership team of the Asian Organizing Committee and WT Tent Business Team held a detailed work meeting in the conference room of WT Tent No. 1. First of all, colleagues at WT Tent Marketing Department reported to the relevant leaders of the Asian Organizing Committee the relevant work results since its establishment of WT Tent for 16 years. Combined with WT Tent's 35 -acre Suzhou headquarters with a clean and orderly park plant, and the relevant engineering cases since WT Tent's establishment since its establishment in 2007, the relevant leaders of the Asian Organizing Committee will host the relevant leaders of our current Asian Games. The construction mission of the venue gave full confidence. Sincere congratulations Conference content 1: In the first half of 2022, Westbert formed a special business team of Hangzhou Asian Games. With the professional Linking technical solution, thick -scale activity service experience, careful and patient attitude of work, with a professional linked technology solution, a professional linked technology solution, only one place in the Chunan project, it won 27.8 million project contracts. He also undertakes the test of multiple 19th Hangzhou Asian Games. In response, the leaders of the Asian Organizing Committee congratulated the Westbert Business Team, and hoped that Westbert would be as good as "2019 World Military Games", "2021 Xi'an National Games", "2022 in 2022 Like the Beijing Winter Olympics, it serves the Hangzhou Asian Games. Very sure Conference content 2 Although the 19th Hangzhou Asian Games was postponed to September 2023, Westbert faced unexpected special challenges, adjusted his mentality, and mobilized quickly. In the case of holding various pressures, it has perfectly completed the mission of multiple venues including the Chun'an District of the Hangzhou Asian Games, and has been deeply recognized by the venue leaders. The visiting leaders of the visiting Asian Organization Committee listened to the Westbert's technical team reported on the deepening drawings of the Chun'an Division, and faced the positive attitude of the Westbert's technical team to facing the complex dilemma. Expressing deep affirmation. The leaders of the Asian Organizing Committee fully affirmed that Westbert actively faced the excellent style of the sudden extension of the Asian Games competition service. It is hoped that the related team of Westburn will continue to work hard. In the next venue bidding work, maintain style, adhere to attitude, and make greater dedication to the current Asian Games. Earnestly Conference content 3 Finally, the main leaders of the Asian Organizing Committee put forward the next step of Westbert: 1. To maintain a positive service mentality and hold the Hangzhou Asian Games into a safe and beautiful event; 2. To maintain a detailed way of working, when serving other venues, we must like to serve the Chunan project: it is difficult to solve the opposite side; 3. To maintain the in -depth cooperation with other service teams such as the operating team, landscape team, and digital team, the venue's facilities will be efficiently and coordinated into the overall framework of the venue; The Westbert's business team carefully records, resolutely implemented, and guarantees the leaders of the Asian Organizing Committee that Westbert must serve each venue with a positive attitude, detailed work, and professional technical technical services.   WT Tent        All products of Suzhou Wt Tent Co., Ltd. are made in Germany, and the main structure is made of high-strength aluminum alloy. The tarpaulin is based on polyfilament long resin, and the surface is attached with PV film. The tarpaulin is mainly white, and other colors can be customized. The Wisbert smart tent has the following characteristics: weatherproof, anti-ultraviolet, B1-level fire
2022-11-17
An article tells clearly why the modular assembly aluminum -alloy tent building uses 6 series aluminum alloy as the main profile

An article tells clearly why the modular assembly aluminum -alloy tent building uses 6 series aluminum alloy as the main profile

WT Tent Popular Science Class "6" is aluminum alloy profile T6061/T6082 aluminum alloy 6 Series aluminum alloy is a high -quality aluminum alloy product produced by the pre -stretching process.   Tips1 What does "6" mean?     We often hear that aluminum alloy has T6061/T6082/1050, etc., why do aluminum alloy divided into these models? As we all know, aluminum alloys are alloy products, which means that aluminum alloy will add metals except aluminum alloy. Therefore, take T6061 for example, the first "6" refers to the classification of aluminum alloy to add different alloys. For specific specifications, please refer to the following: 1) 1xxx series industrial pure aluminum; 2) 2xxx series Al-Cu, AL-CU-Mn alloy,; 3) 3XXX series Al-Mn, processed pure aluminum; 4) 4xxx series Al-SI alloy; 5) 5xxx series Al-MG alloy; 6) 6xxx series Al-MG-SI alloy; 7) 7xxx series Al-Zn-MG-CU alloy;     It can be seen that T6061 and T6082 aluminum profiles are aluminum and magnesium. Silicon alloy. Tips2 The difference between "T6061" and "T6082"?     As mentioned above, the "6" aluminum alloy is metal synthesized by metal elements such as magnesium and silicon in aluminum, so T6061 and T6082 are metal of the series. The difference between them is that the proportion of alloys is different.       In different applications, you can choose the appropriate aluminum alloy as the main profile of the modular assembly aluminum -based tent building. From the perspective of basic strength data, the strength of the main profiles of the two aluminum alloy profiles of T6061 and T6082 has sufficient pressure resistance. picture Tips3 What does "T" in "T6061/T6082" mean?     "T" in "T6061" is the meaning of heat treatment.     The so -called heat treatment refers to: in the solid state, in the solid state, through the means of heating, insulation, and cooling, change the internal tissue state of the metal material to obtain a kind of heat processing technology that needs the required performance. As the main profile of the modular assembly aluminum tent building, the aluminum materials that are treated through the heat can have stronger strength and higher corrosion resistance and other metal properties. The process of heat treatment: 1) Quick annealing: The heating temperature is 350 ~ 410 ° C; with the effective thickness of the material, the thermal insulation time is between 30 and 120 minutes; air or water cooling. 2) High temperature annealing: The heating temperature is 350 ~ 500 ° C; when the thickness of the finished product is ≥6mm, the thermal insulation time is 10-30 minutes, and when the heat is so thoroughly; the air is cold. 3) Low temperature annealing: Heating temperature is 150 ~ 250 ℃; the insulation time is 2 to 3h; air or water cooling.   Tips4 T "6" is the unique advantage of aluminum profile? 1) Excellent processing performance 2) Excellent welding characteristics and electroplating 3) Good corrosion resistance 4) High toughness and no deformation after processing 5) The materials are dense and flawed and easy to polish 6) Easy -to -color film 7) Excellent characteristics such as excellent oxidation effect. Tips5 Why is the aluminum alloy profile for prefabricated buildings? 1) Little density and light weight 2) Strong corrosion resistance 3) Rich contained 4) Good weather resistance 5) Good plasticity and processing performance 6) Good casting performance 7) Good surface treatment performance 8) Good mechanical performance recyclable 9) Magnetic 10) Anti -nuclear radiation 11) Small elastic coefficient 12) Do not spark when impact 13) Non -toxicity 14) Heat conductivity, good conductive performance   WT Tent        All products of Suzhou Wt Tent Co., Ltd. are made in Germany, and the main structure is made of high-strength aluminum alloy. The tarpaulin is based on polyfilament long resin, and the surface is attached with PV film. The tarpaulin is mainly white, and other colors can be customized. The Wisbert smart tent has the following characteristics: weatherproof, anti-ultraviolet, B1-level fireproof, cold-resistant, anti-wrinkle top cloth, opaque, weight 850g/m2, fire-retardant, in line with German DIN 4102 B1, M2 standards Wind load capacity 80-100Km/h.        Company inventory tent: span (width) from 3m-70m, the length can be increased infinitely according to 3m/group or 5m/group. The side height ranges from 2.6m to 12.5m. It has the properties of fireproof, windproof, firm and reliable.        The main products are: spire, herringbone, spherical, curved, arched, peach-shaped and various special-shaped tents. Our event tents, storage tents, wedding tents, and exhibition tents are widely used in family gatherings, business meetings, exhibitions, large-scale celebrations, warehousing logistics, disaster relief inspections and other scenarios. There are no pillars in the middle of the tent, and the venue is 100% used.        Tent interior supporting: floor, platform
2022-10-27

Contact Us

No.389, Zhenghe East Road, Ludu Town, Taicang City, Jiangsu Province,P.R China

WT HOLDINGS GROUP Co.,Ltd.

Solution               Products               About               Blog               Contact

这是描述信息
这是描述信息

ADDRESS:

No.389,Zhenghe east Road,Ludu Town,Taicang City,JiangSu Province,P.R China.

这是描述信息

TEL:

24H Hotline:+(86)0512-53718998
Mobile:+ ( 86 ) 13812929818